Construction Quotation (Hierarchical)
Quotations
Construction
Japanese Version
A construction quotation sample with hierarchical line items including foundation, structural, interior, and utility work.
Sample Content
Subject: New House Construction Quotation for XX Residence
To: XX Real Estate Co., Ltd.
Line Items
| Item | Qty | Unit | Unit Price | Amount |
|---|---|---|---|---|
| Foundation Work | ||||
| Excavation Work | 1 | lot | ¥480,000 | ¥480,000 |
| Rebar Work | 1 | lot | ¥350,000 | ¥350,000 |
| Concrete Pouring | 1 | lot | ¥620,000 | ¥620,000 |
| Formwork | 1 | lot | ¥280,000 | ¥280,000 |
| Structural Work | ||||
| Lumber (Structural Materials) | 1 | lot | ¥1,800,000 | ¥1,800,000 |
| Framing Work | 1 | lot | ¥450,000 | ¥450,000 |
| Roofing Work | 1 | lot | ¥680,000 | ¥680,000 |
| Interior Work | ||||
| Wallpaper Installation | 120 | m² | ¥1,500 | ¥180,000 |
| Flooring | 85 | m² | ¥4,500 | ¥382,500 |
| Fittings & Fixtures | 8 | locations | ¥35,000 | ¥280,000 |
| Utility Work | ||||
| Electrical Wiring | 1 | lot | ¥520,000 | ¥520,000 |
| Plumbing | 1 | lot | ¥680,000 | ¥680,000 |
| HVAC Installation | 1 | lot | ¥450,000 | ¥450,000 |
| Miscellaneous Expenses | 1 | lot | ¥350,000 | ¥350,000 |
Preview
Create This Document with PASELLY
Free sign-up, no credit card required