Condominium Major Renovation Quotation (Hierarchical)
Quotations
Construction
Japanese Version
A condominium major renovation quotation sample with hierarchical line items covering temporary works, exterior wall repair, painting, waterproofing, and sealant work.
Sample Content
Subject: Major Renovation Quotation
To: XX Condominium Management Association
Line Items
| Item | Qty | Unit | Unit Price | Amount |
|---|---|---|---|---|
| Common Temporary Works | ||||
| Scaffolding Erection & Removal | 1500 | m² | ¥900 | ¥1,350,000 |
| Scatter Prevention Net | 1500 | m² | ¥200 | ¥300,000 |
| Site Office & Temporary Restroom | 4 | months | ¥60,000 | ¥240,000 |
| Safety Measures (Signs, Traffic Control, etc.) | 1 | lot | ¥200,000 | ¥200,000 |
| Exterior Wall Repair | ||||
| Wall Tile Delamination Repair (Epoxy Injection) | 200 | locations | ¥1,500 | ¥300,000 |
| Wall Tile Replacement | 50 | pcs | ¥3,000 | ¥150,000 |
| Concrete Crack Repair (U-Cut) | 100 | m | ¥2,000 | ¥200,000 |
| Spalling Repair | 30 | locations | ¥5,000 | ¥150,000 |
| Painting Work | ||||
| Exterior Wall Painting (Incl. Pressure Washing) | 800 | m² | ¥2,500 | ¥2,000,000 |
| Metal Painting (Handrails, Stairs, etc.) | 200 | m² | ¥2,000 | ¥400,000 |
| Ceiling Painting (Common Corridors) | 150 | m² | ¥1,800 | ¥270,000 |
| Waterproofing Work | ||||
| Rooftop Waterproofing (Urethane Ventilated Buffer) | 300 | m² | ¥5,500 | ¥1,650,000 |
| Balcony Waterproofing (Urethane Adhesion Method) | 400 | m² | ¥4,500 | ¥1,800,000 |
| Corridor & Stairway Waterproofing | 200 | m² | ¥4,000 | ¥800,000 |
| Sealant Work | ||||
| Sealant Replacement (Around Window Frames) | 500 | m | ¥1,000 | ¥500,000 |
| Sealant Replacement (Joints) | 300 | m | ¥900 | ¥270,000 |
| Sealant Top-Up | 200 | m | ¥600 | ¥120,000 |
| Miscellaneous (Site Management, Safety Docs & Neighbor Relations) | 1 | lot | ¥500,000 | ¥500,000 |